# Quality Assurance System for Aluminum Casting Mold Manufacturing: From Design to Delivery Complete mold QA system controls quality in every stage from design

  • Browse number: ...
  • Release time: 2026-09-29

Quality Assurance System for Aluminum Casting Mold Manufacturing: From Design to Delivery

Complete mold QA system controls quality in every stage from design review, material incoming inspection, machining, heat treatment, surface treatment, mold trial to final delivery. This article describes Xinfeng mould full-stage QA checkpoints and acceptance criteria.

Stage 1: Design review. 3D model check, gating/riser simulation review, cooling and vent layout review, FEM thermal stress analysis, tolerance stack-up check. Sign-off required before machining.

Stage 2: Raw material incoming inspection. H13 steel blank UT ultrasonic test, material certificate verification, hardness test and surface defect inspection. Reject non-conforming steel blanks.

Stage3: Machining process inspection. Rough machining allowance check, semi-finish CMM inspection, EDM electrode inspection, parting surface flatness and cavity dimension check.

Stage4: Heat treatment QA. Furnace temperature curve recording, hardness testing, distortion measurement, metallographic sampling for batch validation.

Stage5: Surface treatment QA. Nitriding layer thickness measurement, surface roughness test, nitriding layer adhesion test.

Stage6: Mold assembly inspection. Insert assembly clearance, ejector movement test, sealing surface flatness, cooling circuit hydraulic leak test.

Stage7: Mold trial QA. Dry mold test, first shot trial, parameter window test, continuous run test. Collect CMM, X-ray, mechanical and pressure tightness test data.

Stage8: Pre-delivery final inspection. Full mold appearance check, spare parts verification, document package audit, anti-rust treatment and packaging inspection.

Non-conformity handling: any non-conformity found at checkpoint must be isolated, root cause analyzed, corrected and re-inspected before entering next process.

QA document archive: all inspection reports, certificates, simulation files and mold drawings are stored for at least 10 years for traceability.

FAQ

Q1: What is the first checkpoint in Xinfeng mould mold QA system? A1: Design review including simulation, thermal stress analysis and tolerance stack-up check. Q2: What test is required for incoming H13 mold steel blank? A2: UT ultrasonic inspection, material certificate check and hardness test. Q3: How long are mold QA documents retained? A3: QA documents and mold drawings are archived and stored for at least 10 years.