Mold Quality Control & In-process Inspection – Machining Check, Heat Treatment Audit and Final Bench Test

  • Browse number: ...
  • Release time: 2026-10-10

Mold Quality Control & In-process Inspection – Machining Check, Heat Treatment Audit and Final Bench Test

Layered in-process quality control guarantees mold dimensional accuracy and performance before delivery, Xinfeng Mold implements multi-point inspection during mold manufacturing. Rough machining inspection checks mold block dimension, flatness and perpendicularity; material certificate verification is completed before rough machining starts. Semi-finishing inspection controls cavity dimensional tolerance, marking datum and core pocket position; deviation exceeding 0.03 mm requires correction. Heat treatment audit includes steel batch traceability, temperature curve record and hardness spot check; unqualified heat treated blocks are rejected. Many mold dimensional errors are not detected until final assembly; statistics show 45% of assembly rework originates from missing semi-finishing inspection. Polishing inspection verifies surface roughness and scratch-free condition; cavity surface scratches deeper than 0.01 mm are not acceptable. Assembly inspection checks core pulling, ejection and guide movement; all moving parts must slide smoothly without sticking or jamming. Bench test is performed after full mold assembly, including dry run, stroke verification, locking force test and cooling channel pressure test. For vacuum casting molds, bench air tightness test is carried out in workshop before mold trial to catch sealing defects early. All in-process inspection records are linked to mold serial number, forming traceable quality file for each mold project. Inspection tools such as caliper, height gauge, hardness tester and CMM are calibrated periodically to maintain measurement accuracy. Nonconformity found during in-process QC triggers corrective action; affected operation is suspended until rectification and re-inspection pass. Surface treatment (nitriding / PVD) inspection checks coating thickness and adhesion before mold final assembly. Final visual inspection reviews marking, part number, lifting lugs, screw fasteners and completeness of installed inserts. The whole QC workflow is audited according to ISO9001 requirements, and inspection reports are delivered together with mold.

FAQ

Q1: What is the maximum allowable deviation during semi-finishing cavity inspection? A1: Semi-finishing deviation exceeding 0.03 mm requires correction. Q2: What percentage of mold assembly rework is caused by missing semi-finishing inspection? A2: 45% assembly rework comes from incomplete semi-finishing inspection. Q3: What test is performed on vacuum molds during bench test in workshop? A3: Air tightness bench test is completed before mold trial for vacuum molds. Q4: What is checked in heat treatment audit? A4: Steel batch traceability, heat treatment curve and hardness spot check. Q5: What tool calibration requirement supports reliable mold measurement? A5: All inspection measuring instruments are calibrated periodically. Q6: What standard guides the mold QC workflow? A6: QC workflow follows ISO9001 quality management requirements.

Embedded Keywords: Mold Quality Control, In-process Inspection, Bench Test, CMM Measurement, Heat Treatment Audit, Mold Assembly Inspection, Dimensional Tolerance, Surface Polishing, Nonconformity Handling, ISO9001